Asian Development Bank - Fighting Poverty in Asia and the Pacific
What's New  |   e-Notification  |   Sitemap  |   Contact Us  |   Help

Projects

Home : Projects : Project Data Sheet


MFF - Madhya Pradesh Power Sector Investment Program - Project 5 :  India :Go to Project Summary

MFF - Madhya Pradesh Power Sector Investment Program - Project 5 :  India

Timetable  |  Financing Plan and Loan Utilization  |  Project Outcome  |  Implementation Progress  |  Status of Covenants

Loan Name MFF - Madhya Pradesh Power Sector Investment Program - Project 5
Country India
Loan Number 2520
Project Number 32298- 06
Source of Funding/Amount[Approved]
Ordinary Capital Resources US$166.00  million
Thematic Classification Economic growth
Environmental Sustainability
Governance
Capacity Development
Sector/Subsector Energy / Electricity Transmission and Distribution
Description ADB will provide support for the investment program in the form of a multitranche financing facility (MFF). Such support provides a platform for financial and expert
assistance, blending reform and capacity development with investments.
Project Outcome
Outcome Progress Toward Outcome
Reduction of electric distribution system losses, improved reliability of power, increased system capacity and improved customer connectivity. Implementation ongoing.
Implementation Progress
Outputs Status of Implementation Progress (Outputs, Activities and Issues)
tbd
The ADB supported subset of the investment program to be financed from Tranche 5 will cover targeted capital works designed to improve efficiency through loss reduction and to enhance supply reliability in all DISCOMs. Subprojects will include (a) a rollout of a HVDS; (b) provisions for automatic remote meter reading and distribution transformer metering for energy auditing purposes; (c) renovation of substation protection systems, installation of capacitor banks and general substation renovation and modernization; (d) construction of new substations and increasing substation transformer capacity; (e) construction of new distribution lines an upgrading of existing lines; and (f) expansion of village lighting schemes (feeder separation schemes).
Part A (DISCOM-C). For Part A, the Projects physical progress is 49.8% against elapsed loan period of 41% as of 31 December 2010. All 11 contracts have been signed and implementation is ongoing.

Part B (DISCOM-E). For Part B, the Projects physical progress is 45.6% compared against elapsed loan period of 41% as of 31 December 2010. All 7 contracts have been signed and implementation is ongoing.

Part C (DISCOM-W). For Part C, the Projects physical progress is 34.6% against elapsed loan period of 41% as of 31 December 2010. 11 contracts have been signed and implementation is ongoing, while procurement for two contracts (PPR-34 & 35) for distribution system strengthening is underway.
Geographical Location Madhya Pradesh (Jabalpur, Indore and Bhopal)
Safeguard Categories Safeguard Categories explained (Launches new browser window)
  Environment B
  Resettlement C
  Indigenous People C
Responsible ADB Officer Hiroki Kobayashi
Jyotirmoy Banerjee
Responsible ADB Department South Asia Department
Responsible ADB Division Energy Division, SARD
Timetable
Board Approval 13 Apr 2009
CLOSING
Loan No. Approval Signing Effectivity Original Revised Actual
2520-IND 13 Apr 09 27 May 09 07 Sep 09 30 Jun 13 - -

Financing Plan Top Loan Utilization
  TOTAL ( Amount in US$ million)
Project Cost 166.00
ADB 166.00
Counterpart 0.00
Cofinancing 0.00
Date ADB OTHERS Net Percentage
Cumulative Contract Awards
20 May 2013 158.267 95%
Cumulative Disbursements
20 May 2013 100.869 61%
Top Status of Covenants
Category Sector Social Financial Economic Others Safe
Rating Satisfactory Satisfactory Satisfactory Satisfactory
© 2008 Asian Development Bank

Privacy | Terms of Use
  Top of page